- Installation of 8,100 of 8 steel for We Energies (Summer 2008)
- Installation of 29,040 of 20 steel for We Energies (Summer 2008)
- Installation of 23,900 of 16 steel for We Energies (Summer 2008)
- Installation of 24,825 of 12 steel for We Energies (Spring 2008)
- Installation of 12,500 of 12 and 16 steel for Integrys (Spring 2008)
- Installation of 12,950 of 12 steel for We Energies (Spring 2008)
- Installation of 7,900 of 12 steel for Integrys (Spring 2008)
- Installation of 26,000’ of 12” steel for Mid American Energy in Ankeny, Iowa
- Replacement of 6,000’ of 6” and 8” steel and construction of station for Ameren-IP in Champaign, Illinois.
- Installation of 2,800 of 16” steel to the under construction Oak Creek Power Plant.
- Installation of 41,000’ of 12” steel for Wisconsin Public Service Corporation in Denmark, Wisconsin.
- Replacement of over 4300 services as part of the Service line replacement program for CenterPoint Energy in Coon Rapids, Minnesota.
- Installation of 14,300' of 4", 6" and 8" steel and 50 services for Nicor in Addison, Illinois.
- Installation of 3500' of 2", 4100' of 4" and 70 Services for Wisconsin Public Service Corporation in Stevens Point, Wisconsin.
- Various Steel Projects and Service Replacements for Cinergy in Cincinnati, Ohio.
- Renewal project for Ameren in Moberly, Missouri including installation of 6600' of 2" poly, 1450' of 4" poly and 53 services.
- 13.2 miles of conduit installed via directional drilling, blowing and testing of fiber for TDS Telecom.
- Various telecommunication projects for SBC.
- Placement of Conduit and Hand Holes for McLeod USA in Milwaukee, Wisconsin.
- Installation of 15,000' of 12" steel in Oshkosh, Wisconsin for Wisconsin Public Service.
- Various Manhole Replacements for We Energies in Milwaukee, Wisconsin.
|